Ryan Malloy 5c4a7a57f1 Phase 26: Pool rollback-on-release - CRITICAL data-correctness fix (2026.05.05)
Fixes the dirty-pool-checkout bug surfaced by Margaret Hamilton's
system-wide audit (Critical #1).

The bug: ConnectionPool.release() returned connections with open
server-side transactions still active. Request A's uncommitted
INSERTs would be inherited by Request B reusing the same connection -
B's commit would land A's writes permanently; B's rollback would
silently lose them. Same shape as psycopg2's pre-2.5 dirty-pool bug.

The fix: pool.release() now rolls back any open transaction before
returning the connection to the idle list. The rollback runs OUTSIDE
the pool lock since it's a wire round-trip - the connection is
already off the idle list and counted in _total, so no other thread
can grab it during the rollback window. If the rollback itself fails
(dead socket, etc.), the connection is evicted rather than recycled.

Async path covered automatically: AsyncConnectionPool.release()
delegates to the sync pool's release via _to_thread.

Margaret Hamilton review pass surfaced two findings, both addressed:
* Silent rollback failure: added a WARNING log via logging.getLogger
  ("informix_db.pool") so evictions are debuggable. First logger in
  the project.
* Async cancellation race: the fix doesn't introduce the
  asyncio.wait_for race (Critical #2, deferred to Phase 27), but it
  adds a code path that can trigger it. Documented loudly in
  pool.release() docstring, aio.py module docstring, and USAGE.md
  async section. Recommendation: use read_timeout on the connection
  instead of asyncio.wait_for until Phase 27 lands.

Two new regression tests in tests/test_pool.py:
* test_uncommitted_writes_invisible_to_next_acquirer (the bug)
* test_committed_writes_survive_pool_checkout (no over-correction)

Verified the regression test catches the bug: stashed the fix, ran
the test - it fails with "B sees 1 rows - leaked across pool
checkout boundary" - confirming it tests the real failure mode.

Total tests: 72 unit + 226 integration + 28 benchmark = 326.

Deferred to Phase 27 per Hamilton audit:
* Critical #2 (concurrency / per-connection wire lock)
* High #3 (async cancellation routes to broken=True)
* High #4 (bare except in _raise_sq_err drain)
* High #5 (no cursor finalizers - server-side resource leaks)
2026-05-05 03:22:18 -06:00
..