Cospas-Sarsat specification summaries moved to reference/ for internal use only. Links updated to point to official cospas-sarsat.int site. The extracted images remain in public/ for use in other pages.
1182 lines
34 KiB
Markdown
1182 lines
34 KiB
Markdown
---
|
||
title: "T008: Cospas-Sarsat Acceptance Of"
|
||
description: "Official Cospas-Sarsat T-series document T008"
|
||
sidebar:
|
||
badge:
|
||
text: "T"
|
||
variant: "note"
|
||
# Extended Cospas-Sarsat metadata
|
||
documentId: "T008"
|
||
series: "T"
|
||
seriesName: "Technical"
|
||
documentType: "specification"
|
||
isLatest: true
|
||
issue: 3
|
||
revision: 7
|
||
documentDate: "October 2023"
|
||
originalTitle: "Cospas-Sarsat Acceptance"
|
||
---
|
||
|
||
> **📋 Document Information**
|
||
>
|
||
> **Series:** T-Series (Technical)
|
||
> **Version:** Issue 3 - Revision 7
|
||
> **Date:** October 2023
|
||
> **Source:** [Cospas-Sarsat Official Documents](https://www.cospas-sarsat.int/en/documents-pro/system-documents)
|
||
|
||
---
|
||
|
||
# T008 - T008-OCT-27-2023.pdf
|
||
|
||
**Pages:** 23
|
||
|
||
---
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
COSPAS-SARSAT ACCEPTANCE
|
||
OF 406 MHz BEACON
|
||
TYPE APPROVAL TEST FACILITIES
|
||
|
||
C/S T.008
|
||
Issue 3 – Revision 7
|
||
|
||
|
||
COSPAS-SARSAT ACCEPTANCE OF 406 MHz
|
||
BEACON TYPE APPROVAL TEST FACILITIES
|
||
|
||
|
||
|
||
HISTORY
|
||
|
||
Issue
|
||
Revision
|
||
Date
|
||
Comments
|
||
|
||
|
||
Approved by CSC-11
|
||
|
||
|
||
Approved by CSC-15
|
||
|
||
|
||
Approved by CSC-25
|
||
|
||
|
||
Approved by CSC-35
|
||
|
||
|
||
Approved by CSC-57
|
||
|
||
|
||
Approved by CSC-59
|
||
|
||
|
||
Approved by CSC-60
|
||
|
||
|
||
Approved by CSC-61
|
||
|
||
|
||
Approved by CSC-62
|
||
|
||
|
||
Approved by CSC-63
|
||
|
||
|
||
Approved by CSC-64
|
||
|
||
|
||
Approved by CSC-66
|
||
|
||
|
||
Approved by CSC-69
|
||
|
||
|
||
TABLE OF CONTENTS
|
||
Page
|
||
|
||
History ..................................................................................................................................................... i
|
||
Table of Contents ................................................................................................................................... ii
|
||
List of Tables ........................................................................................................................................ iii
|
||
List of Figures ....................................................................................................................................... iii
|
||
1.
|
||
INTRODUCTION ...................................................................................................... 1-1
|
||
1.1
|
||
Purpose ....................................................................................................................... 1-1
|
||
1.2
|
||
Scope .......................................................................................................................... 1-1
|
||
1.3
|
||
Reference Documents................................................................................................. 1-1
|
||
2.
|
||
COSPAS-SARSAT ACCEPTANCE OF 406 MHZ BEACON TEST FACILITIES 2-1
|
||
2.1
|
||
Policy .......................................................................................................................... 2-1
|
||
2.2
|
||
Costs ........................................................................................................................... 2-1
|
||
2.3
|
||
Required Capabilities of Test Facility ........................................................................ 2-1
|
||
2.4
|
||
Summary of Beacon Acceptance Process for New Test Facilities ............................. 2-2
|
||
2.5
|
||
Acceptance Process for Approved Test Facilities Wishing to Extend their Test
|
||
Capabilities ......................................................................................................... 2-4
|
||
2.6
|
||
Cospas-Sarsat Acceptance .......................................................................................... 2-5
|
||
2.7
|
||
Other Capabilities ....................................................................................................... 2-5
|
||
3.
|
||
406 MHZ BEACON TEST FACILITY ACCEPTANCE PROCESS ....................... 3-1
|
||
3.1
|
||
Quality Assurance ...................................................................................................... 3-1
|
||
3.2
|
||
Application Package ................................................................................................... 3-1
|
||
3.3
|
||
Technical Review ....................................................................................................... 3-1
|
||
3.4
|
||
On-Site Technical Visit .............................................................................................. 3-2
|
||
3.5
|
||
Beacon Test ................................................................................................................ 3-2
|
||
3.6
|
||
Review of Beacon Test Report ................................................................................... 3-3
|
||
3.7
|
||
Report and Recommendations to Cospas-Sarsat ........................................................ 3-3
|
||
3.8
|
||
Retention of Test Facility Acceptance ....................................................................... 3-4
|
||
|
||
|
||
LIST OF ANNEXES
|
||
|
||
ANNEX A - MEASUREMENT UNCERTIANTY REQUIREMENTS FOR TYPE-APPROVAL
|
||
TESTING OF BEACONS COMPLIANT WITH DOCUMENTS C/S T.001/T.015 .....
|
||
................................................................................................................................... A-1
|
||
ANNEX B - MEASUREMENT UNCERTAINTY REQUIREMENTS FOR TYPE-APPROVAL
|
||
TESTING OF BEACONS COMPLIANT WITH DOCUMENT C/S T.018 ............ B-1
|
||
ANNEX C - APPLICATION TO BECOME A COSPAS-SARSAT ACCEPTED 406 MHZ
|
||
BEACON TYPE APPROVAL TEST FACILITY .................................................... C-1
|
||
ANNEX D - APPLICATION TO EXTEND COSPAS-SARSAT ACCEPTED 406 MHZ BEACON
|
||
TYPE APPROVAL TEST FACILITY CAPABILITIES ......................................... D-1
|
||
D.1 Checklist of Data Items Provided by Test Facility .................................................... D-2
|
||
|
||
|
||
|
||
LIST OF FIGURES
|
||
|
||
Figure 2.1: Process to Become a Cospas-Sarsat Accepted 406 MHz Beacon Type Approval Test
|
||
Facility ........................................................................................................................ 2-3
|
||
|
||
|
||
|
||
LIST OF TABLES
|
||
|
||
Table A-1: Measurement Uncertainty Requirements for Type-Approval Testing of 406-MHz Beacons
|
||
Compliant with Documents C/S T.001/T.015 ........................................................... A-2
|
||
Table B-1: Measurement Uncertainty Requirements for Type-Approval Testing of 406-MHz Beacons
|
||
Compliant with Document C/S T.018 ....................................................................... B-2
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
1-1
|
||
|
||
1.
|
||
INTRODUCTION
|
||
1.1
|
||
Purpose
|
||
The purpose of this document is to set the technical criteria and state the procedures to be followed
|
||
when applying to become a Cospas-Sarsat accepted test facility for type approval of 406-MHz beacons
|
||
compliant with documents C/S T.001, C/S T.015 and/or C/S T.018.
|
||
1.2
|
||
Scope
|
||
Section 1 states the contents of this document and references; section 2 states the Cospas-Sarsat policy
|
||
and outlines the acceptance process. Section 3 describes the acceptance process in detail.
|
||
|
||
Annex A lists the required measurement uncertainties of the parameters measured at a Cospas-Sarsat
|
||
accepted test facility for the type-approval testing of documents C/S T.001/T.015 – compliant beacons.
|
||
|
||
Annex B lists the required measurement uncertainties of the parameters measured at a Cospas-Sarsat
|
||
accepted test facility for the type-approval testing of document C/S T.018 – compliant beacons.
|
||
|
||
Annex C is an application form which is to be completed and submitted to start the acceptance process
|
||
by Cospas-Sarsat.
|
||
1.3
|
||
Reference Documents
|
||
|
||
C/S T.001
|
||
Specification for Cospas-Sarsat 406 MHz Distress Beacons
|
||
C/S T.007
|
||
Cospas-Sarsat 406 MHz Distress Beacon Type Approval Standard
|
||
C/S T.015
|
||
Cospas-Sarsat Specification and Type Approval Standard For 406 MHz Ship Security
|
||
Alert (SSAS) Beacons
|
||
C/S T.018
|
||
Specification for Second-Generation Cospas-Sarsat 406-MHz Distress Beacons
|
||
C/S T.021
|
||
Cospas-Sarsat Second Generation 406-MHz Distress Beacon Type Approval Standard
|
||
ISO-17025
|
||
General requirements for the competence of calibration and testing laboratories
|
||
ISO/IEC Guide 98-3:2008
|
||
Uncertainty of measurement -- Part 3: Guide to the expression of
|
||
uncertainty in measurement (GUM:1995)
|
||
|
||
- END OF SECTION 1 -
|
||
|
||
|
||
|
||
2-1
|
||
October 2023
|
||
|
||
2.
|
||
COSPAS-SARSAT ACCEPTANCE OF 406 MHZ BEACON TEST FACILITIES
|
||
2.1
|
||
Policy
|
||
Test facilities may apply to become a Cospas-Sarsat accepted type approval facility by following the
|
||
procedures described in this document. The test facility must be independent of any beacon
|
||
manufacturer.
|
||
|
||
Test facilities that are accepted by the Cospas-Sarsat Council are entitled to perform tests on
|
||
406 MHz distress beacons for the purpose of having a Cospas-Sarsat Type Approval Certificate issued
|
||
by the Cospas-Sarsat Secretariat. A list of Cospas-Sarsat accepted type approval test facilities and
|
||
information on which generation (i.e., C/S T.001 or C/S T.018 – compliant) of beacon they are
|
||
approved to perform beacon type-approval testing is maintained by the Secretariat.
|
||
2.2
|
||
Costs
|
||
The direct costs (i.e., travel, accommodation, laboratory testing, etc.) associated with carrying out this
|
||
Cospas-Sarsat acceptance procedure will be borne by the applicant facility.
|
||
2.3
|
||
Required Capabilities of Test Facility
|
||
For test facilities seeking Cospas-Sarsat acceptance, the test facility must be capable of performing all
|
||
tests on a 406 MHz beacon in accordance with the applicable issue of documents C/S T.007, C/S T.015
|
||
or C/S T.021, as appropriate. The antenna tests may be performed at a different location, but the
|
||
responsibility of meeting the requirements still lies with the test facility. The term “measurement
|
||
uncertainty” is defined in Annex A. The measurement uncertainty requirements of the test facility for
|
||
documents C/S T.001/T.015-compliant beacons are listed in Table A-1 in Annex A, and for document
|
||
C/S T.018-compliant beacons - in Table B-1 in Annex B of this document.
|
||
|
||
The Quality Assurance Programme prepared and used by the test facility must meet the requirements
|
||
of ISO-17025 or other standards equivalent to, or exceeding ISO-17025 requirements, as accepted by
|
||
the Cospas-Sarsat Council.
|
||
|
||
|
||
|
||
|
||
|
||
2-2
|
||
October 2023
|
||
|
||
2.4
|
||
Summary of Beacon Acceptance Process for New Test Facilities
|
||
The acceptance process, illustrated in Figure 2.1 and described in detail in section 3, evaluates the
|
||
applicant's test facility technical capabilities and Quality Assurance Programme.
|
||
|
||
a) The applicant's test facility would have its Quality Assurance Programme assessed by a
|
||
national accreditation organization. The test facility must meet the Cospas-Sarsat requirements
|
||
which are given in Table A-1 of Annex A and/or Table B-1 of Annex B, and the requirements
|
||
of ISO-17025 or other standards equivalent to, or exceeding ISO-17025 requirements, as
|
||
accepted by the Cospas-Sarsat Council.
|
||
b) The test facility would submit its application form (see Annex C) plus the required technical
|
||
data (see section 3.2) to the Secretariat.
|
||
c) The submission would then be reviewed by an ad-hoc technical team consisting of the
|
||
Secretariat and technical experts designated by the Cospas-Sarsat Council.
|
||
d) An on-site technical visit would then be conducted by one of the technical team members to
|
||
observe tests being performed, including antenna tests.
|
||
e) A complete set of type approval tests are then performed according to the appropriate document
|
||
listed in section 1.3 on a test beacon provided by the applicant or borrowed from Cospas-Sarsat.
|
||
f) If the test beacon has not previously been tested, either at another already approved test facility,
|
||
or at facilities designated by the Cospas-Sarsat Parties, the beacon would subsequently be
|
||
tested by one of these facilities.
|
||
g) Upon completion of the tests, a test report will be written and sent to the Secretariat by the
|
||
applicant, and by the reference test facility, as applicable. The reports will be reviewed by the
|
||
technical team and their findings will be provided to the applicant, to the Cospas-Sarsat Parties
|
||
and to the Joint Committee for review and recommendations to the Council.
|
||
h) If the documentation demonstrates that the test facility meets the Cospas-Sarsat requirements,
|
||
the Cospas-Sarsat Parties may grant interim acceptance of the facility until the formal review
|
||
by the Joint Committee and Council has been completed.
|
||
Following acceptance by the Council, the facility will need to provide, on an annual basis, a letter
|
||
confirming that their Quality Assurance technical status is still maintained.
|
||
|
||
The Figure 2.1, below, illustrates the steps in initially becoming an accepted Cospas-Sarsat Test facility
|
||
for either first generation beacons, second generation beacons or both.
|
||
|
||
|
||
|
||
|
||
|
||
2-3
|
||
October 2023
|
||
|
||
Documentation Review
|
||
by Technical Team
|
||
On-Site Visit by
|
||
Technical Expert
|
||
Beacon Testing by Applicant
|
||
and by Reference Test Facility
|
||
(if applicable)
|
||
Comparison with Known Results
|
||
by Technical Team
|
||
Findings Provided to Applicant
|
||
and to Cospas-Sarsat
|
||
Interim Acceptance by
|
||
Cospas-Sarsat Parties
|
||
(if applicable)
|
||
Review by Joint Committee and
|
||
Recommendations to Council
|
||
Final Acceptance by
|
||
Cospas-Sarsat Council
|
||
Retention of Acceptance
|
||
Application Submitted to the
|
||
Cospas-Sarsat Secretariat
|
||
Quality Assurance Certification
|
||
|
||
|
||
Figure 2.1: Process to Become a Cospas-Sarsat Accepted
|
||
406 MHz Beacon Type Approval Test Facility
|
||
|
||
|
||
|
||
|
||
2-4
|
||
October 2023
|
||
|
||
2.5
|
||
Acceptance Process for Approved Test Facilities Wishing to Extend their Test
|
||
Capabilities
|
||
Extended capabilities are the ability to test either different generations of beacon or new features and
|
||
capabilities added to beacons. These extended capabilities are reflected in new type approval standards
|
||
or changes to existing type approval standards that are determined by the Council to be significant
|
||
enough that a recertification of the test facility is required to ensure that they can satisfactorily perform
|
||
the necessary additional testing requirements.
|
||
|
||
For those accepted Cospas-Sarsat test facilities already holding an accreditation to perform type-
|
||
approval testing of documents C/S T.001/T.015/T.018-compliant beacons and wishing to extend type-
|
||
approval testing capabilities the acceptance process shall be as follows:
|
||
a)
|
||
the test facility shall submit to the Secretariat an application including:
|
||
i. application form (Annex D in lieu of Annex C) specifying what capabilities are
|
||
to be added,
|
||
ii. all relevant technical data (see section 3.2) needed to extend test capabilities,
|
||
including the checklist in Annex D.1, and
|
||
iii. documentation confirming compliance of the applicant facility with
|
||
requirements of ISO-17025 or other standards equivalent to, or exceeding ISO-
|
||
17025 requirements, as accepted by the Cospas-Sarsat Council, covering the
|
||
extended testing capabilities (see section 3.2);
|
||
b) the submission would then be reviewed by the Secretariat and Parties’ technical experts
|
||
(technical team). This technical team will determine which, if any, type approval tests from the
|
||
appropriate document listed in section 1.3 need to be conducted based on the desired
|
||
capabilities to be added to the currently approved capabilities of the test facility;
|
||
c) the type approval tests determined by the technical team are then performed on a test beacon
|
||
provided by the applicant or borrowed from Cospas-Sarsat;
|
||
d) an on-site technical visit may be conducted by one or more of the technical team members to
|
||
observe tests being performed, including antenna tests;
|
||
e) if the test beacon has not previously been tested, either at another already approved test facility,
|
||
or at facilities designated by the Cospas-Sarsat Parties, the beacon would subsequently be
|
||
tested by one of these facilities;
|
||
f) upon completion of the tests, test reports will be written and sent to the Secretariat by the
|
||
applicant, and by the approved test facility or facilities designated by the Cospas-Sarsat Parties,
|
||
as applicable. The reports will be reviewed by the technical team and their findings will be
|
||
provided to the applicant, to the Cospas-Sarsat Parties and to the Joint Committee for review
|
||
and recommendations to the Council;
|
||
g) if anomalies are detected in the test data, and the technical team identifies specific necessary
|
||
modifications to the facility’s testing procedures during the review, the test facility may be
|
||
asked to perform modified tests;
|
||
|
||
|
||
|
||
2-5
|
||
October 2023
|
||
|
||
h) The technical team may also propose corresponding clarifications to the applicable Cospas-
|
||
Sarsat document listed in section 1.3 to the next Joint Committee meeting for review and
|
||
recommendation to the Council; and
|
||
i) if the documentation demonstrates that the test facility meets the Cospas-Sarsat requirements,
|
||
the Cospas-Sarsat Parties may grant interim acceptance of the facility until the formal review
|
||
by the Joint Committee and Council has been completed.
|
||
2.6
|
||
Cospas-Sarsat Acceptance
|
||
When the procedure has been successfully completed and the test facility has been accepted by the
|
||
Cospas-Sarsat Council, the name of the facility and information on which generation of beacon it is
|
||
approved to perform type-approval testing of, will be included in the list of accepted test facilities
|
||
which is maintained by the Cospas-Sarsat Secretariat.
|
||
2.7
|
||
Other Capabilities
|
||
The applicant test facility may also wish to provide Cospas-Sarsat with a description of its capabilities
|
||
for testing 406 MHz beacons to national or other international standards.
|
||
|
||
|
||
|
||
- END OF SECTION 2 -
|
||
|
||
|
||
|
||
3-1
|
||
October 2023
|
||
|
||
3.
|
||
406 MHZ BEACON TEST FACILITY ACCEPTANCE PROCESS
|
||
3.1
|
||
Quality Assurance
|
||
The applicant must obtain certification from a national accreditation organization that its test facility
|
||
meets the quality assurance requirements defined in ISO-17025 or other standards equivalent to, or
|
||
exceeding ISO-17025 requirements, as accepted by the Cospas-Sarsat Council.
|
||
3.2
|
||
Application Package
|
||
The application form provided in Annex C of this document is to be completed and submitted to the
|
||
Cospas-Sarsat Secretariat.
|
||
|
||
The application package must include a letter or certificate from a national accreditation organization
|
||
in the applicant's country confirming that the applicant's Quality Assurance Programme meets the
|
||
requirements defined in ISO-17025 or other standards equivalent to, or exceeding ISO-17025
|
||
requirements, as accepted by the Cospas-Sarsat Council. The name and address of this accreditation
|
||
organization must also be given.
|
||
|
||
Further, the application package must also include the following technical data:
|
||
|
||
a) a list of test equipment required to perform Cospas-Sarsat testing, serial number and model
|
||
number;
|
||
b) test equipment calibration reports;
|
||
c) test equipment traceability to National Standards;
|
||
d) a description of software to be used (if applicable);
|
||
e) calibration reports and traceability of environmental chambers (if applicable);
|
||
f) a copy of technical procedures they intend to use during approval testing; and
|
||
g) a list of the actual test facility measurement uncertainties.
|
||
|
||
The completed application package is to be submitted to the Cospas-Sarsat Secretariat who will verify
|
||
that the necessary information is included in the package.
|
||
3.3
|
||
Technical Review
|
||
Upon submission of the completed application package, the Cospas-Sarsat Secretariat will send a copy
|
||
to the technical experts appointed by the Cospas-Sarsat Council to work with the Secretariat. These
|
||
experts will review the technical material and provide recommendations on whether or not to proceed
|
||
to the next step.
|
||
|
||
|
||
|
||
|
||
3-2
|
||
October 2023
|
||
|
||
Once the recommendations indicate that the applicant test facility meets the basic requirements, an
|
||
on-site technical visit is arranged.
|
||
3.4
|
||
On-Site Technical Visit
|
||
One or more technical experts on beacon testing then visits the applicant test facility. Some tests,
|
||
including antenna tests, are to be performed on a beacon to demonstrate to the technical expert the
|
||
capabilities of the test facility. The technical experts will verify the following, noting any existing
|
||
certifications for those facilities that have been certified for type approval of the document C/S
|
||
T.001/T.015-compliant beacons:
|
||
|
||
a) the availability of the required test equipment;
|
||
b) witness the operation of the test equipment and antenna test range;
|
||
c) the test equipment and environmental chambers are calibrated and traceable to national
|
||
standards;
|
||
d) assess the use of applicable procedures; and
|
||
e) evaluate the procedures, measurement uncertainties, data sheets and results for completeness
|
||
and accuracy.
|
||
|
||
A report will be made by the technical experts to Cospas-Sarsat confirming that the test facility is now
|
||
ready to proceed to the next step.
|
||
3.5
|
||
Beacon Test
|
||
The test facility will perform a full set of Cospas-Sarsat tests that include antenna tests on a 406 MHz
|
||
beacon, which may be operated from an external power supply, and subsequently provides the test
|
||
report to Cospas-Sarsat for review and analysis. The test report is to be written in the format described
|
||
in documents C/S T.007 and C/S T.021.
|
||
|
||
The beacon testing can be performed in either of two ways:
|
||
|
||
a) the test facility can acquire its own beacon, on which it conducts the tests and then provides
|
||
the beacon to one of the designated Cospas-Sarsat test facilities for a subsequent verification
|
||
test, which the applicant would pay for; or
|
||
b) alternatively, the applicant could arrange, on a bilateral basis, to borrow from one of the other
|
||
accepted test facilities a test beacon having known, previously measured, characteristics. The
|
||
applicant would then perform the full set of tests on this beacon and prepare a test report.
|
||
If the test beacon has not previously been tested, either at another already approved test facility, or at
|
||
facilities designated by the Cospas-Sarsat Parties, the beacon would subsequently be tested by one of
|
||
these facilities.
|
||
|
||
|
||
|
||
|
||
3-3
|
||
October 2023
|
||
|
||
3.6
|
||
Review of Beacon Test Report
|
||
The test report, duly signed by the test facility's authorized official should then be submitted to the
|
||
Cospas-Sarsat Secretariat.
|
||
|
||
The Cospas-Sarsat Secretariat and the technical experts will review the test report and compare the
|
||
results generated by the applicant's test facility with those of the verification test facility, taking into
|
||
account the measurement accuracies of the two test facilities.
|
||
|
||
If there is a significant difference between the two sets of test results, some additional tests may be
|
||
requested.
|
||
3.7
|
||
Report and Recommendations to Cospas-Sarsat
|
||
A report is prepared jointly by the Secretariat and the technical experts. Their findings will be provided
|
||
to the Applicant, to the Cospas-Sarsat Parties and to the Joint Committee for its review and
|
||
recommendation as appropriate to the Cospas-Sarsat Council.
|
||
|
||
If the documentation demonstrates that the test facility meets the Cospas-Sarsat requirements, the
|
||
Cospas-Sarsat Parties may grant interim acceptance of the facility until the formal review by the Joint
|
||
Committee and Council has been completed.
|
||
|
||
Following acceptance of the test facility by the Cospas-Sarsat Council, the Secretariat will notify the
|
||
applicant of the Council decision. If the process is successful, the applicant's name will then be included
|
||
in the list of Cospas-Sarsat accepted type approval test facilities maintained by the Secretariat.
|
||
|
||
|
||
|
||
|
||
|
||
3-4
|
||
October 2023
|
||
|
||
3.8
|
||
Retention of Test Facility Acceptance
|
||
|
||
The retention of test facility acceptance is the responsibility of the test facility. This will be
|
||
accomplished by supplying to the Cospas-Sarsat Secretariat:
|
||
|
||
•
|
||
a letter submitted annually by May stating their intention to retain their Cospas-Sarsat
|
||
acceptance and confirming that their test facility continues to meet all the requirements of the
|
||
latest versions of Cospas-Sarsat standards (i.e., C/S T.001/ T.007, T.015, T.018/T.021, T.008,
|
||
IP(TCXO), IP(LIRB)), for which they were accepted, and identify any additional or modified
|
||
test functionality which has not been implemented;
|
||
•
|
||
a list attached to the letter that would include the following technical data:
|
||
a) a list of issues and revisions of Cospas-Sarsat standards that the test facility meets
|
||
and any additional or modified functionality which has not been implemented, if
|
||
applicable;
|
||
b) a list of any additional test equipment required including, serial number and model
|
||
number;
|
||
c) test equipment calibration reports for any additional test equipment showing
|
||
traceability to National Standards;
|
||
d) a description of any new software to be used;
|
||
e) information on any new technical procedures they intend to use during approval
|
||
testing, however a copy of the new technical procedures - to be submitted upon a
|
||
request from the Secretariat); and
|
||
f)
|
||
a list of the actual test facility measurement uncertainties for the new procedures /
|
||
equipment; and
|
||
•
|
||
a reassessment of the facility's Quality Assurance Programme by a national accreditation
|
||
organization every five years.
|
||
|
||
|
||
In addition, the Cospas-Sarsat Council reserves the right to request:
|
||
•
|
||
that a technical expert (designated by the Council) be entitled to visit the test facility
|
||
periodically;
|
||
•
|
||
that a test be conducted every two years (at no cost to Cospas-Sarsat) on a beacon provided
|
||
by Cospas-Sarsat; and
|
||
•
|
||
a technical audit by Cospas-Sarsat every five years.
|
||
|
||
|
||
|
||
- END OF SECTION 3 -
|
||
October 2023
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
ANNEXES TO
|
||
COSPAS-SARSAT ACCEPTANCE
|
||
OF 406 MHz BEACON
|
||
TYPE APPROVAL TEST FACILITIES
|
||
|
||
|
||
|
||
|
||
|
||
|
||
A-1
|
||
|
||
ANNEX A - MEASUREMENT UNCERTIANTY REQUIREMENTS FOR TYPE-
|
||
APPROVAL TESTING OF BEACONS COMPLIANT WITH DOCUMENTS C/S T.001/T.015
|
||
Introduction
|
||
|
||
Measurement Uncertainty: An uncertainty budget is a statement of a measurement uncertainty, of the
|
||
components of that measurement uncertainty, and of their calculation and combination. It should
|
||
include the measurement model, estimates, and measurement uncertainties associated with the
|
||
quantities in the measurement model, covariance’s, type of applied probability density functions,
|
||
degrees of freedom, type of evaluation of measurement uncertainty, and any coverage factor. An
|
||
uncertainty budget is not simply a summary table; it has to include all these factors. The actual test
|
||
facility measurement uncertainty is determined considering all of the elements mentioned in this
|
||
paragraph.
|
||
|
||
|
||
|
||
|
||
|
||
|
||
A-2
|
||
|
||
Table A-1: Measurement Uncertainty Requirements for Type-Approval Testing of 406-MHz
|
||
Beacons Compliant with Documents C/S T.001/T.015
|
||
Parameter
|
||
Beacon Requirement
|
||
Required Test Facility
|
||
Measurement Uncertainty
|
||
Repetition Time
|
||
see C/S T.001 Section 2.2.1
|
||
± 0.01 sec
|
||
Total Transmission Time
|
||
440 ms ± 4.4 ms, or
|
||
520 ms ± 5.2 ms
|
||
± 1.0 ms
|
||
First Burst Delay
|
||
≥ 47.5 sec (for beacons other
|
||
than ELTs when activated
|
||
automatically by G-switch /
|
||
deformation)
|
||
|
||
≤15.0 sec (for ELTs when
|
||
activated automatically by
|
||
G-switch/deformation)
|
||
|
||
≤ 5.00 sec (for ELT(DT)s)
|
||
± 1 sec
|
||
|
||
|
||
|
||
|
||
± 1 sec
|
||
|
||
|
||
± 0.01 sec
|
||
CW Preamble
|
||
160 ms ± 1.6 ms
|
||
± 1.0 ms
|
||
Bit Rate
|
||
see C/S T.001 Section 2.2.4
|
||
± 0.6 bps
|
||
Nominal Frequency
|
||
see C/S T.001 Section 2.3.1
|
||
± 100 Hz
|
||
Frequency Stability
|
||
see C/S T.001 Section 2.3.1
|
||
< 0.1 ppb
|
||
Transmitted Power
|
||
See C/S T.001 Section 2.3.2, or
|
||
C/S T.015 Section 2.2
|
||
± 0.5 dB
|
||
Spurious Power Level
|
||
see Figure 2.3 in C/S T.001
|
||
± 2 dB
|
||
Power Output Rise Time
|
||
See C/S T.001 Section 2.3.2
|
||
± 0.5 ms
|
||
|
||
± 0.2 ms (for ELT(DT))
|
||
Power Level 1 ms Before Burst
|
||
< - 10 dBm
|
||
± 2 dB
|
||
Modulation Rise
|
||
See C/S T.001 Section 2.3.6
|
||
± 25 s
|
||
Modulation Symmetry
|
||
0.05
|
||
< 0.01
|
||
Phase Modulation
|
||
±1.1 rad ± 0.1 rad
|
||
± 0.04 rad
|
||
Internal
|
||
Navigation
|
||
Device
|
||
Timing
|
||
All times within C/S T.001
|
||
Sections 4.5.5.2, 4.5.5.3 and
|
||
4.5.5.4
|
||
Times equal to or less than
|
||
one hour: +/- 1 second;
|
||
Times greater than one hour:
|
||
+/- 10 seconds
|
||
Temperature (near beacon)
|
||
various
|
||
± 2C
|
||
Antenna Measurement
|
||
see C/S T.007 Annex B
|
||
± 3 dB
|
||
All
|
||
EIRP
|
||
Antenna
|
||
Setup
|
||
Measurement Distances
|
||
See C/S T.007 Annex B
|
||
± 1 %
|
||
|
||
- END OF ANNEX A -
|
||
|
||
|
||
|
||
B-1
|
||
October 2023
|
||
|
||
|
||
|
||
ANNEX B - MEASUREMENT UNCERTAINTY REQUIREMENTS FOR
|
||
TYPE-APPROVAL TESTING OF BEACONS COMPLIANT WITH DOCUMENT C/S T.018
|
||
Introduction
|
||
|
||
Measurement Uncertainty: An uncertainty budget is a statement of a measurement uncertainty, of the
|
||
components of that measurement uncertainty, and of their calculation and combination. It should
|
||
include the measurement model, estimates, and measurement uncertainties associated with the
|
||
quantities in the measurement model, covariances, type of applied probability density functions,
|
||
degrees of freedom, type of evaluation of measurement uncertainty, and any coverage factor. An
|
||
uncertainty budget is not simply a summary table; it has to include all these factors. The actual test
|
||
facility measurement uncertainty is determined considering all of the elements mentioned in this
|
||
paragraph.
|
||
|
||
|
||
|
||
|
||
|
||
|
||
B-2
|
||
October 2023
|
||
|
||
|
||
|
||
Table B-1: Measurement Uncertainty Requirements for Type-Approval Testing of 406-MHz
|
||
Beacons Compliant with Document C/S T.018
|
||
|
||
Parameter
|
||
Beacon Requirement
|
||
Required Test Facility
|
||
Measurement Uncertainty
|
||
Repetition Time
|
||
See C/S T.018 Section 2.2.1
|
||
± 0.01 sec
|
||
Total Transmission Time
|
||
1000 ms ± 1 ms,
|
||
± [0.1] ms
|
||
First Burst Delay
|
||
See C/S T.018 Section 2.2.1
|
||
± 1 sec
|
||
|
||
± 0.01 sec (for ELT(DT))
|
||
Bit Rate
|
||
300 bps ± 3 bps
|
||
± 0.6 bps
|
||
Chip Rate Accuracy
|
||
See C/S T.018 Section 2.3.1.2
|
||
± [0.05] chips/sec
|
||
Chip Rate Variation
|
||
See C/S T.018 Section 2.3.1.2
|
||
± [0.05] chips/sec2
|
||
Nominal Frequency
|
||
406.050 MHz ± 1200 Hz
|
||
± 100 Hz
|
||
Frequency Stability
|
||
see C/S T.018 section 2.3.1.1
|
||
< 0.7 ppb
|
||
Average Conducted
|
||
Transmitted Power
|
||
See C/S T.021 section B.1
|
||
± 0.5 dB
|
||
Spurious Power Level
|
||
see mask in C/S T.018 section
|
||
2.3.2
|
||
± 2 dB
|
||
Error Vector Magnitude
|
||
< 15% from ideal
|
||
[1%]
|
||
Power Level 25 ms Before Burst
|
||
< - 10 dBm
|
||
± 2 dB
|
||
Power Rise Time
|
||
< 0.5 ms
|
||
± 0.025 ms
|
||
Modulation Symmetry
|
||
See C/S T.018 Section 2.3.3
|
||
I,Q offset
|
||
I,Q peak-to-peak amplitude
|
||
|
||
|
||
± [0.025] s
|
||
[1%]
|
||
|
||
Temperature (near beacon)
|
||
various
|
||
± 2C
|
||
EIRP
|
||
see C/S T.021 Annex B
|
||
± 3 dB
|
||
All
|
||
EIRP
|
||
Antenna
|
||
Setup
|
||
Measurement Distances
|
||
See C/S T.021 Annex B.11
|
||
± 1 %
|
||
|
||
|
||
- END OF ANNEX B -
|
||
|
||
|
||
|
||
C-1
|
||
October 2023
|
||
|
||
|
||
|
||
ANNEX C - APPLICATION TO BECOME A COSPAS-SARSAT ACCEPTED 406 MHZ
|
||
BEACON TYPE APPROVAL TEST FACILITY
|
||
|
||
|
||
Applicant Test Facility:
|
||
|
||
|
||
(name, address, etc.)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
National Accreditation Organization:
|
||
|
||
|
||
(name, address, etc.)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
DECLARATION OF APPLICANT:
|
||
|
||
The test facility
|
||
located at _________________________________________________________________________
|
||
applies to become a Cospas-Sarsat accepted test facility for type approval of beacons compliant with
|
||
documents C/S T.001/T.015 and/or C/S T.018 (strike-out as appropriate) and provides the enclosed
|
||
documentation and quality assurance certification.
|
||
|
||
I hereby agree to provide the technical information required by Cospas-Sarsat, as defined in documents
|
||
C/S T.008, C/S T.007, C/S T.015 and/or C/S T.021.
|
||
|
||
______________________
|
||
__________________________________________________
|
||
Date
|
||
Signature of Test Facility Representative
|
||
|
||
|
||
|
||
|
||
- END OF ANNEX C -
|
||
|
||
|
||
|
||
D-1
|
||
October 2023
|
||
|
||
|
||
|
||
ANNEX D - APPLICATION TO EXTEND COSPAS-SARSAT ACCEPTED 406 MHZ
|
||
BEACON TYPE APPROVAL TEST FACILITY CAPABILITIES
|
||
Applicant Test Facility:
|
||
|
||
|
||
(name, address, etc.)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
National Accreditation Organization:
|
||
|
||
|
||
(name, address, etc.)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
DECLARATION OF APPLICANT:
|
||
|
||
The test facility
|
||
located at ________________________________________________________________________
|
||
applies to extend beacon type approval test capabilities as a Cospas-Sarsat accepted test facility. The
|
||
test facility wishes to add the following test capabilities at this time (Check all boxes as appropriate):
|
||
|
||
□
|
||
C/S T.001 beacons (non ELT(DT))
|
||
|
||
□
|
||
C/S T.015 beacons
|
||
|
||
□
|
||
C/S T.018 beacons (non ELT(DT))
|
||
|
||
□
|
||
C/S T.001 ELT(DT) beacons
|
||
|
||
□
|
||
C/S T.018 ELT(DT) beacons
|
||
|
||
□
|
||
Other: ____________________________________ (Specify)
|
||
|
||
I hereby agree to provide the technical information required by Cospas-Sarsat, as defined in documents
|
||
C/S T.008, C/S T.007, C/S T.015 and/or C/S T.021.
|
||
|
||
______________________
|
||
__________________________________________________
|
||
Date
|
||
Signature of Test Facility Representative
|
||
|
||
|
||
|
||
|
||
|
||
D-2
|
||
October 2023
|
||
|
||
|
||
|
||
D.1
|
||
Checklist of Data Items Provided by Test Facility
|
||
|
||
Tick ( )
|
||
to indicate
|
||
submission
|
||
of items
|
||
Applicable
|
||
C/S T.008
|
||
requirement
|
||
Description of technical information item
|
||
File name, title of document, page,
|
||
section, where the item is located
|
||
|
||
2.5-a)(i)
|
||
Application to Extend Cospas-Sarsat Accepted
|
||
406 MHz Beacon Type Approval Test Facility
|
||
Capabilities (Annex D)
|
||
|
||
|
||
2.5-a)(i)
|
||
Check-list of technical information
|
||
(Annex D.1, i.e., this table)
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-a
|
||
Technical Data: List of Test Equipment
|
||
(including model numbers and serial numbers)
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-b
|
||
Technical
|
||
Data:
|
||
“New”
|
||
Test
|
||
Equipment
|
||
Calibration Reports
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-c
|
||
Technical Data: Test equipment traceability to
|
||
National Standards
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-d
|
||
Technical Data: Description of Test Software
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-e
|
||
Technical
|
||
Data:
|
||
Calibration
|
||
reports
|
||
and
|
||
traceability of environmental chambers
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-f
|
||
Technical Data: Technical procedures intended
|
||
for use during approval testing
|
||
|
||
|
||
2.5-a)(ii)
|
||
Part 3.2-g
|
||
Technical Data: List of the actual test facility
|
||
measurement uncertainties
|
||
|
||
|
||
2.5-a)(iii)
|
||
Part 3.2
|
||
Technical Data: Documentation confirming
|
||
compliance of the applicant facility with
|
||
requirements of ISO 17025 or other standards
|
||
|
||
|
||
|
||
Other supplemental technical material
|
||
(at the discretion of the applicant facility)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
_______
|
||
(date of)
|
||
|
||
______________________________________
|
||
(Test Facility point of contact for the
|
||
application: name, job title, e-mail address)
|
||
|
||
|
||
_______________________________
|
||
(signature)
|
||
|
||
|
||
|
||
- END OF DOCUMENT -
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
Cospas-Sarsat Secretariat
|
||
1250 Boul. René-Lévesque West, Suite 4215, Montréal (Québec) H3B 4W8 Canada
|
||
Telephone: +1 514 500 7999 / Fax: +1 514 500 7996
|
||
Email: mail@cospas-sarsat.int
|
||
Website: www.cospas-sarsat.int |